It’s hard to remember what I did over a 2 week period and here are things I forgot to put in my last post. On a Saturday I had a recording session with the woman who will be play the old woman (Catherine) and also with the girl who is playing a little girl who lives on the street. On Monday I will be have a second recording session getting the voices for the little boy will be with the little girl and I will also recording new lines for Viv & Mandy.
I also meant to say you may have spotted that the layout of this blog has had some changes made to it. Not all the pages have been fully set up yet but the photo gallery and concept art pages will be updated soon. So keep coming back and cheeking for any updates to them pages and the production of the all new Viv & Mandy.
19 July 2010
18 July 2010
Busy two weeks and got many more to come!!
It has been a busy 2 weeks here at, I started it off by picking up were I ended the last post. I finally got the large size houses street set finished, I add the fences to the street with clay and wood I then painted them so they are the same colour as the small size full street set.
Now that he basic look and colour to the street was completed it was now to time to the more detailed painting the sets. This manly consisted of adding the mess and dirt to house number 6 and the fencing. When I was happy with the paint job I gulled the house to the set so it won’t move around when I’m animating.
Now that the set was completed it was time for me to start animating. The first thing I animated on this set was the close ups of the post man posting the letters. I did this as it was tight close ups and would give me a good length of time to get used to working on this set. I hat to shoot three letter boxes, the first one was done in one day and the last two were done on next day.
After I finished animating the posting letters were completed I redid the full postman puppet. I had to remake the full size puppet because with the new street set design it did not fit in with the scale of the set. It took me over 4 hrs to make the body, and it took me 3 more hrs the next day to make the head.
After the postman was completed, I when online and ordered 8 new super strong magnets so the puppets will stay still and for walk cycles. After I ordered the magnets I went into the work shot / studio and started to animate my first scene with the new postman puppet. i spent the rest of the day animating all the shots of the postman going up to and waking away from the all the clean houses.
The next day I picked up from were I left of the day before and shot all the shot of the postman going into and from the messy house. To get the shots were the camera will see the houses on the opposite side of the street I had to use the small scale houses and use perspective so hey don’t look to small and out of place.
The next day the magnets arrived in the post, when I opened them I went into the studio and set up the full scale house set for the postman puppet and the magnets. When every thing was set up I spent the rest of that day animating my first walking scene with magnets.
When the walking shot was completed I then exported all the completed shots and edited them in to the final animation shot so fare. With the new animation added in I now how the opening sequence of the film completed lasting over 50 seconds, I now have 4 minuets over all completed.
With all the shots with the postman completed and edited I can now start shooting with Viv & Mandy them selves. This will be the first time I have animate with then sins April and the first time I have done any animation with lip sync sins before Christmas. Before I can do any of that I needed to spend almost 4hrs getting them ready for animating. As of now this is how Viv & Mandy are in the studio reedy for a full day of animating with them tomorrow.
So that’s you all up to date!, please do come back in 2 weeks time were I will do another update on the production of the all new Viv & Mandy.
4 July 2010
Now In full production!!
I left college last Friday with the finally grade of DDD (distinction, distinction, distinction) the most I can get on BTEC course. So now I have been in full production on Viv & Mandy for a full week.
All this week I have been making a set of two houses and the street that are at the right scale of Viv & Mandy.
This is the largest set I have made as to date, the set is not yet completed as it taken such a long time to do but will be bye the middle of next week.
Here are some images shows how I have made this set.
I got the wood and marked out were all the parts of set will go and were the holes that are need to fix the puppets to the set will go.
From there I went on to add the long over grown grass that would be outside one on the house. To do this I had to sit there and glue in the grass blade by blade I don’t know how many are there but as u can see from the image there a lot.
From that a started making the two houses for the street, one will have a big role in film and has to have a working door and be decorated on the inside, the other one is there for close ups and wide shots so not as much detail on the door and the inside is needed.
I used the same wood as I did for the street, marked out and cut out the wood into the shape of the houses. As you can see one house has the full outer house cut and the second one only has the first floor cut out.
I then glued on the sides and painted the houses.
To make the door so it fully works I nailed in a small set of hinges to the door its self and nailed in the he other side into the door frame on the inside of the house so it would work as a reel door.
I then painted the doors on the houses, the second house dose not need to open so its only wood gulled the house. In cut and panted strips of wood and uses them for the window and door frames on the houses inside and out.
For the house that will be used a lot in the story I decorated hen inside of it with wall paper and skirting boards, there will be more details added when the set I glued to the street set.
With houses now completed it was time to glue them to the street set and do all the final touches with paint and set design. To the insides of the hoses and the street it’s self. These are not completed and will be finessed off next and I will begin animation on this very large set.
So come back in 2 weeks time when I will do a new post and see were I am in the production of the new Viv & Mandy.
All this week I have been making a set of two houses and the street that are at the right scale of Viv & Mandy.
This is the largest set I have made as to date, the set is not yet completed as it taken such a long time to do but will be bye the middle of next week.
Here are some images shows how I have made this set.
I got the wood and marked out were all the parts of set will go and were the holes that are need to fix the puppets to the set will go.
From there I went on to add the long over grown grass that would be outside one on the house. To do this I had to sit there and glue in the grass blade by blade I don’t know how many are there but as u can see from the image there a lot.
From that a started making the two houses for the street, one will have a big role in film and has to have a working door and be decorated on the inside, the other one is there for close ups and wide shots so not as much detail on the door and the inside is needed.
I used the same wood as I did for the street, marked out and cut out the wood into the shape of the houses. As you can see one house has the full outer house cut and the second one only has the first floor cut out.
I then glued on the sides and painted the houses.
To make the door so it fully works I nailed in a small set of hinges to the door its self and nailed in the he other side into the door frame on the inside of the house so it would work as a reel door.
I then painted the doors on the houses, the second house dose not need to open so its only wood gulled the house. In cut and panted strips of wood and uses them for the window and door frames on the houses inside and out.
For the house that will be used a lot in the story I decorated hen inside of it with wall paper and skirting boards, there will be more details added when the set I glued to the street set.
With houses now completed it was time to glue them to the street set and do all the final touches with paint and set design. To the insides of the hoses and the street it’s self. These are not completed and will be finessed off next and I will begin animation on this very large set.
So come back in 2 weeks time when I will do a new post and see were I am in the production of the new Viv & Mandy.
20 June 2010
Not long now!
Its not long now till I finish college I’m in my final week and very busy trying to get all my work up to the best standard I can as of now I have got 6 distinctions out of 18 unites hopping to get 4 more by the end of week.
As for Viv & Mandy I have been trying my best to get some work on it on in my free time. I got the shot the post man on the full street set completed and now I am spending my time making a new full scale house set from scratch which is taking longer then I first fort.
For much more information check back in two weeks for a new update I would have left college and will be working on the new Viv & Mandy full time.
As for Viv & Mandy I have been trying my best to get some work on it on in my free time. I got the shot the post man on the full street set completed and now I am spending my time making a new full scale house set from scratch which is taking longer then I first fort.
For much more information check back in two weeks for a new update I would have left college and will be working on the new Viv & Mandy full time.
7 June 2010
Had my week off animating now back at college
Had my week off animating now back at college
Had a grate week off college no only did I go to Lego land which is were 7 years ago I got the Lego studios kit started off my whole animation film making. But I also got 7 seconds of good quality animation completed.
The week started off making a small scale boy and girl that would play out on the street in front of there house with a ball. After I had finished making the puppets they when striate into the work shop and animated them.
The next day I rebuilt complete the Hogsmeat Lane which it massive and takes up all most the enterer Workshop and is very hard to set the camera up on, set lights up on, movie around and to animate on. I set up the set in the opposite direction as I waned to shoot the van driving down the lane to the messy house, with the boy and girl playing on the street and a man mowing his lawn. All the animation form that angel was shot in day.
After all the shots of the van driving the lane were completed I spent the morning rebuilding the street set right direction. I did the so I can get the shots that will open the animation of the postman walking down the street.
2 days later I went back into the work shop and animated the first shots of the post man walking down the street. I had to stop animating halfe way thought the next shot as the heat in work shop got to much for the models and they started to fall apart.
I plan on finishing those shots in the next week or two so check back in two weeks time when I will up date this blog with more new and images from the production of my new Viv & Mandy film.
Had a grate week off college no only did I go to Lego land which is were 7 years ago I got the Lego studios kit started off my whole animation film making. But I also got 7 seconds of good quality animation completed.
The week started off making a small scale boy and girl that would play out on the street in front of there house with a ball. After I had finished making the puppets they when striate into the work shop and animated them.
The next day I rebuilt complete the Hogsmeat Lane which it massive and takes up all most the enterer Workshop and is very hard to set the camera up on, set lights up on, movie around and to animate on. I set up the set in the opposite direction as I waned to shoot the van driving down the lane to the messy house, with the boy and girl playing on the street and a man mowing his lawn. All the animation form that angel was shot in day.
After all the shots of the van driving the lane were completed I spent the morning rebuilding the street set right direction. I did the so I can get the shots that will open the animation of the postman walking down the street.
2 days later I went back into the work shop and animated the first shots of the post man walking down the street. I had to stop animating halfe way thought the next shot as the heat in work shop got to much for the models and they started to fall apart.
I plan on finishing those shots in the next week or two so check back in two weeks time when I will up date this blog with more new and images from the production of my new Viv & Mandy film.
Subscribe to:
Posts (Atom)